Block 1271, Lot 25Built 1920Height 104 ftBIN 1034825

2active devices
32active violations
4issued 2 Oct 2026
2019oldest Cat 1 test on file

Get an email when this building changes

Devices

DeviceStatusLast Cat 1 testLast Cat 5 testActive violationsSource
1P11709Elevator
Active
11 Dec 2019
11 Dec 2019
13 active
1P11710Elevator
Active
11 Dec 2019
11 Dec 2019
12 active

Boilers

BoilerLast inspection filedReportDefectsFiling statusSource
10000012931N0001Low Pressure
11 Sep 2019
Initial
Yes
Accepted

Violations since 2019

1P117091P11710No device20192020202120222023202420252026

ViolationIssued 2 Oct 2026Last Cat 1 test on file

Violations in the last two years

IssuedViolationDeviceDOB saysStatus
2 Oct 2026
VIO-FTF-VT-PER-202512-0002816
1P11710
Periodic inspection report not filed
Active
2 Oct 2026
VIO-FTF-VT-PER-202512-0002815
1P11709
Periodic inspection report not filed
Active
2 Oct 2026
VIO-FTF-VT-CAT1-202512-0002364
1P11710
Cat 1 test report not filed
Active
2 Oct 2026
VIO-FTF-VT-CAT1-202512-0002363
1P11709
Cat 1 test report not filed
Active
14 Nov 2025
111425LBLVIO03208
—
Boiler
Active
29 Aug 2025
VIO-FTF-VT-PER-202412-0003065
1P11710
Periodic inspection report not filed
Active
29 Aug 2025
VIO-FTF-VT-PER-202412-0003064
1P11709
Periodic inspection report not filed
Active
29 Aug 2025
VIO-FTF-VT-CAT1-202412-0003619
1P11710
Cat 1 test report not filed
Active
29 Aug 2025
VIO-FTF-VT-CAT1-202412-0003618
1P11709
Cat 1 test report not filed
Active

23 earlier violations, back to 2019, are in the Compliance Report.

These violations mean DOB had no report on file for that cycle. It is not a finding that a device is unsafe, and the owner may have filed since. Current status on DOB BIS

Guides: what a failure-to-file notice means · how penalties work · boiler annual filing

Public NYC records as of 27 Oct 2026. Not an inspection, a compliance certificate or legal advice. Not affiliated with NYC DOB.